Facilities

The facilities comprises a detached, steel portal frame construction industrial/ factory unit with brickwork/ insulated steel sheeting to the external walls, under a pitched profile steel roof. The property was originally constructed in c. 2004 and the industrial accommodation was extended to the southern elevation in 2008 by the tenant.

The main factory space is divided between the original unit and the extension to the rear and can be accessed from both the eastern and southern sides of the unit via roller shutter doors. Within the extension is a 5-tonne, automated cranage system, in addition to newly developed office accommodation. To the front of the unit is a reception area, a mixture of open plan and cellular office accommodation over two-storeys housing the tenants Purchase/ Credit Control/ Accounts/ Design teams, a number of canteens and toilet facilities.

Externally there is a secure service yard to the eastern and southern elevations of the unit, three wind turbines, two points of access and approximately 36 car parking spaces. To the rear of the southern yard is an area of undeveloped scrub-land that could be used to extend the current yard area further. This site extends to approximately 0.348 hectares (0.86 acres).

%d bloggers like this: